air hanger_Building a new air-conditioning steel structure factory
来源steel building llc
2025-08-14 03:39:53
Building a new air-conditioning steel structure factory can usually be divided into the following steps: Project planning Market research: Analyze market demand, competitors and target customers. Site selection: Select a suitable plot of land, considering factors such as transportation, resources and environment. Design stage Preliminary design: Determine the scale, layout and functional zoning of the factory. Engineering design: Including civil engineering, steel structure design, electrical and HVAC design, etc., to ensure compliance with relevant specifications. Approval and permission Apply for permission: Apply for construction permit and environmental protection approval from the local government. Obtain approval: Ensure that all design and construction plans are approved by relevant departments. Fund raising Budget preparation: Prepare a detailed project budget, including construction, equipment procurement and operating costs. Financing plan: Determine the source of funds, such as bank loans, investors or own funds. Construction preparation Bidding and selection of contractors: Select suitable construction units and suppliers. Procurement of materials: Procurement of steel structures and other building materials according to the design plan. Construction stage Infrastructure construction: Carry out earthwork and foundation construction. Steel structure installation: Complete the construction and fixing of steel structures. Internal and external decoration: Carry out the decoration of the interior and exterior of the factory and install equipment. Equipment installation Air conditioning system installation: Install air conditioning equipment to ensure that it meets the design requirements. Other equipment commissioning: Install and commission production equipment. Acceptance and delivery Completion acceptance: Carry out project completion acceptance to ensure that all standards meet the requirements. Delivery and use: After completing all procedures, the factory will be delivered for use. Operational preparation Staff recruitment and training: Recruit employees and conduct necessary training. Production plan: Develop a production plan and prepare for production. Through these steps and establishing contact with Hebei Hongji Shunda Steel Structure , the project of the new air-conditioning steel structure factory can be effectively completed.