Building a new air-conditioning steel structure factory can usually be divided into the following steps:

 

Market research: Analyze market demand, competitors and target customers.

Site selection: Select a suitable plot of land, considering factors such as transportation, resources and environment.

  • Design stage

Preliminary design: Determine the scale, layout and functional zoning of the factory.

Engineering design: Including civil engineering, steel structure design, electrical and HVAC design, etc., to ensure compliance with relevant specifications.

  • Approval and permission

Apply for permission: Apply for construction permit and environmental protection approval from the local government.

Obtain approval: Ensure that all design and construction plans are approved by relevant departments.

  • Fund raising

Budget preparation: Prepare a detailed project budget, including construction, equipment procurement and operating costs.

Financing plan: Determine the source of funds, such as bank loans, investors or own funds.

Bidding and selection of contractors: Select suitable construction units and suppliers.

Procurement of materials: Procurement of steel structures and other building materials according to the design plan.

  • Construction stage

Infrastructure construction: Carry out earthwork and foundation construction.

Steel structure installation: Complete the construction and fixing of steel structures.

Internal and external decoration: Carry out the decoration of the interior and exterior of the factory and install equipment.

  • Equipment installation

Air conditioning system installation: Install air conditioning equipment to ensure that it meets the design requirements.

Other equipment commissioning: Install and commission production equipment.

  • Acceptance and delivery

Completion acceptance: Carry out project completion acceptance to ensure that all standards meet the requirements.

Delivery and use: After completing all procedures, the factory will be delivered for use.

  • Operational preparation

Staff recruitment and training: Recruit employees and conduct necessary training.

Production plan: Develop a production plan and prepare for production.

 

Through these steps and establishing contact with Hebei Hongji Shunda Steel Structure, the project of the new air-conditioning steel structure factory can be effectively completed.

 

Gawani

Nkhani Zathu Zaposachedwa

We have a professional design team and an excellent production and construction team.

Ngati muli ndi chidwi ndi zinthu zathu, mutha kusankha kusiya zambiri zanu pano, ndipo tidzalumikizana nanu posachedwa.