Sep . 09, 2024 13:11 Back to list

Building a new air-conditioning steel structure factory

Building a new air-conditioning steel structure factory can usually be divided into the following steps:

 

Market research: Analyze market demand, competitors and target customers.

Site selection: Select a suitable plot of land, considering factors such as transportation, resources and environment.

  • Design stage

Preliminary design: Determine the scale, layout and functional zoning of the factory.

Engineering design: Including civil engineering, steel structure design, electrical and HVAC design, etc., to ensure compliance with relevant specifications.

  • Approval and permission

Apply for permission: Apply for construction permit and environmental protection approval from the local government.

Obtain approval: Ensure that all design and construction plans are approved by relevant departments.

  • Fund raising

Budget preparation: Prepare a detailed project budget, including construction, equipment procurement and operating costs.

Financing plan: Determine the source of funds, such as bank loans, investors or own funds.

Bidding and selection of contractors: Select suitable construction units and suppliers.

Procurement of materials: Procurement of steel structures and other building materials according to the design plan.

  • Construction stage

Infrastructure construction: Carry out earthwork and foundation construction.

Steel structure installation: Complete the construction and fixing of steel structures.

Internal and external decoration: Carry out the decoration of the interior and exterior of the factory and install equipment.

  • Equipment installation

Air conditioning system installation: Install air conditioning equipment to ensure that it meets the design requirements.

Other equipment commissioning: Install and commission production equipment.

  • Acceptance and delivery

Completion acceptance: Carry out project completion acceptance to ensure that all standards meet the requirements.

Delivery and use: After completing all procedures, the factory will be delivered for use.

  • Operational preparation

Staff recruitment and training: Recruit employees and conduct necessary training.

Production plan: Develop a production plan and prepare for production.

 

Through these steps and establishing contact with Hebei Hongji Shunda Steel Structure, the project of the new air-conditioning steel structure factory can be effectively completed.

 

Share

Our Latest News

We have a professional design team and an excellent production and construction team.

If you are interested in our products, you can choose to leave your information here, and we will be in touch with you shortly.