Factory

125,000 m² Across Six Workshops, and the Steel Barely Leaves the Yard.

Cutting, fit-up, welding, blasting and coating all happen on the same site in Jinzhou. That is why a member reaches your site at ±3 mm — and why we can give you a date and hold it.

125,000 m²across six production workshops
300,000Mts of light and heavy steel sections a year
4 × 150-Mtsoverhead cranes in the heavy bays
2plants, both inside Jinzhou, Hebei
The Jinzhou manufacturing base, seen from the approach road
The Jinzhou base, on the east side of the Industrial Road overpass. Both plants sit inside this block.
Machines

Six Machines That Set the Tolerance

A drawing is only as good as the machine that follows it. These are the six that decide whether your member fits on site.

CNC plate cutting table

CNC plate cutting

Plate nested and cut straight from the model, so the cut list and the drawing cannot drift apart.

Beam coping and cutting

Beam coping and cutting

Flange and web cut square in one pass, with copes and bolt holes burned at the same setting.

H-beam fit-up line

H-beam fit-up line

Web and flange clamped square on a fixed bed before the first pass goes down, not after.

Gantry submerged-arc welding station

Gantry submerged-arc welding

Saw and weld ride the same gantry, so a long seam runs without being turned by hand.

Box girder assembly station

Box girder assembly

Box sections squared and clamped on a hydraulic bed, then welded in sequence to hold the twist out.

400 Mts press brake

400-Mts press brake

Stiffeners, base plates and folded sections pressed in house, so they arrive on the day the beam does.

The floor

What Each Bay Does

Five bays, one direction of travel. Nothing doubles back, and nothing waits in the open for a truck that is not booked.

01
Cutting bay

Plate and section cut to the model, offcuts tagged back into stock the same shift.

02
Fit-up bay

Members assembled square, with the mark number painted on before welding starts.

03
Welding bay

Gantry seams first, then the connections. Every main seam passes ultrasonic before it leaves.

04
Blast and paint

Shot blasted to the agreed grade, primed and finished to the dry film thickness on the drawing.

05
Yard and loading

Bundled by erection sequence, so the piece you need first is the piece you unload first.

Heavy lift

150 Mts, Lifted as One Piece

Four 150-Mts overhead cranes run the heavy bays, with 50-Mts units on the lighter lines. That is not a number for the brochure — it is what lets a deep plate girder be turned, trial-assembled and loaded whole, instead of being cut into pieces that have to be spliced again on your site.

It also decides what we can quote. Trusses and transfer girders that other shops decline because they cannot be handled are ordinary work here.

150-Mts overhead crane in the heavy bay
Multi-head CNC cutting machine
Multi-head CNC cutting, running a full plate programme in one set-up.
Open fabrication bay with crane rails
The heavy bay, with crane rails at three levels along the full length.

Send Us a Drawing. We Will Tell You What We Would Change.

No price, no obligation — an engineer reads your plan and tells you where the cost and the trouble usually sit.