If you’re weighing a prefab aircraft hangar this season, here’s what I’m seeing on the ground. HongJi ShunDa, based at No. 1 YuLong Road, JinZhou, Shijiazhuang, Hebei, has been turning out galvanized steel clear-span buildings that—frankly—surprised me for the price-to-performance ratio. The pitch is simple: modular steel, big openings, predictable erection schedules, and compliance baked into the engineering. In practice, it’s the small things—door selection, snow and wind design, corrosion package—that decide whether your airplanes live comfortably or constantly fight the elements.
Airports (and heliports, and increasingly UAV depots) want column-free interiors, fast permits, and predictable life-cycle costs. Steel hangars keep gaining share because clear spans up to ≈90 m are routine, and modular bays shorten construction time. To be honest, fabric structures still tempt some operators with lighter upfront costs, but many customers say they end up adding insulation, wind bracing, and maintenance that narrows the gap. Steel, especially hot-dip galvanized, ages gracefully—coastal sites included.
| Feature | Typical Value | Notes |
|---|---|---|
| Structure | Welded H-sections, cold-formed purlins | Clear span up to ≈90 m; column-free bays |
| Steel grade | Q355B / Q235B (yield ≈345/235 MPa) | AISC/EN design equivalents available |
| Corrosion protection | Hot-dip galvanizing ≥ Z275 g/m² | ISO 1461 / ASTM A123; ISO 12944 C3–C4 paint optional |
| Design loads | Wind up to ≈0.9 kPa; Snow up to ≈1.5 kPa | ASCE 7 / EN 1991; real-world use may vary |
| Doors | Bi-fold, hydraulic, sliding | Custom clear opening for wingspan/tail height |
| Envelope | Insulated panels or single-skin + liner | Rock wool / PU; U-values per climate zone |
| Service life | 30–50+ years | With periodic inspection and coating upkeep |
| Compliance | IBC/ASCE, EN 1090, NFPA 409 (as specified) | CE marking, ISO 9001 quality system |
Flight schools, MRO bays, corporate flight departments, FBOs, EMS helicopter bases, ag operators, even UAV test centers. Many clients like the clear-span flexibility: today a pair of turboprops, tomorrow a mid-size jet plus tooling. One Hebei FBO manager told me the energy bill dropped after adding insulated roof panels and a smarter door seal—small tweak, big payoff.
| Vendor | Structure | Clear-span | Lead time | Compliance | Warranty |
|---|---|---|---|---|---|
| HongJi ShunDa | Galvanized steel, welded H | Up to ≈90 m | ≈6–12 weeks | EN 1090, ISO 9001; NFPA 409 on request | Up to 20 yrs on structure |
| Local builder | Steel frame, painted | ≈40–60 m | 8–20 weeks | Varies by region | 10–15 yrs typical |
| Fabric system | Tensioned membrane | ≈30–60 m | 4–10 weeks | Wind/snow rated; fire varies | 5–15 yrs on fabric |
Quick case note: a coastal charter operator specced heavier zinc (Z350), stainless hinges, and a bi-fold door with wind locks. Two typhoon seasons later, zero structural issues and only a gasket swap—modest maintenance for a pretty harsh site.
Bottom line? A prefab aircraft hangar is less about the shell and more about matching loads, doors, and corrosion strategy to your ops. Get those right and the rest—schedule, cost, uptime—falls into place.
Bolted Connections in Steel Frame Warehouse
NewsNov.17,2025
Hay Storage in Farm Metal Buildings
NewsNov.17,2025
Advantages of a Steel Portal Frame Shed
NewsNov.17,2025
The Erection Process of a Steel Building Hangar
NewsNov.17,2025
Energy Efficiency of Steel Dome Garage Kits
NewsNov.17,2025
Fire Resistance of Kit Metal Garages
NewsNov.17,2025
Products categories
Our Latest News
We have a professional design team and an excellent production and construction team.