Let’s be honest: hangars are where aviation dreams either stay pristine or get eaten by weather and time. That’s why the first time I walked through a prefab aircraft hangar from HongJi ShunDa, I immediately noticed the quiet—no rattling, no weird echo from flimsy cladding. Just solid, clear-span space and the faint smell of new steel.
Across the industry, we’re seeing three big shifts: faster deployment, smarter envelope performance, and compliance-first engineering. Airports and operators want column-free, modular bays; they also want wind/snow resilience, fire compliance (hello, NFPA 409), and doors that don’t jam when a front rolls in. HongJi ShunDa leans into all three with high-tensile galvanized steel, CNC-cut members, and clear-span frameworks that keep interiors uncluttered. Customers tell me the install timelines are “actually realistic,” which is rarer than you’d think.
| Parameter | Typical Spec (≈, real-world use may vary) |
|---|---|
| Clear span | Up to ≈ 90 m column-free (larger with custom truss) |
| Steel grade | Q355B / ASTM A572 Gr. 50 primary frames; ASTM A653 G90 (Z275) galvanized cladding |
| Design codes | AISC 360, ASCE 7-22, IBC 2021, NFPA 409, local code alignment |
| Loads | Wind up to ≈ 155 mph (250 km/h) options; snow 0.5–2.5 kPa; seismic per site class |
| Doors | Hydraulic, bi-fold, or stacking sliders; automated control packages available |
| Fire & safety | NFPA 409-compliant designs; foam/water deluge integration; UL/FM roof options |
| Service life | ≈ 30–50 years with proper maintenance |
GA fleets, MRO shops, charter operators, flight schools, air-cargo, and even ag sprayers. I’ve seen a prefab aircraft hangar double as a parts warehouse in off-season—flexibility counts.
| Vendor Type | Engineering Depth | Lead Time | Compliance | Customization |
|---|---|---|---|---|
| HongJi ShunDa (Origin: No. 1 YuLong Road JinZhou Shijiazhuang Hebei) | In-house structural + door systems | ≈ 6–12 weeks fabrication | AISC/ASCE/IBC/NFPA alignment | High (bay spacing, doors, insulation, finishes) |
| Typical Local Contractor | Varies; often outsourced | Variable (material availability) | Depends on consultant | Medium |
| Generic Kit Seller | Basic (limited PE stamping) | Fast shipping | May lack NFPA/airport specifics | Low–Medium |
Regional GA operator: 60 m clear-span prefab aircraft hangar with hydraulic door; crew said install “went smoother than expected,” zero leaks through the first storm season.
Cargo ramp upgrade: modular twin-bay with bi-fold doors; night crews praised the lighting/insulation combo for cutting HVAC run-time by ≈18% during summer (client utility data, three months).
It’s the mix of clear-span engineering, disciplined QA, and code-aware detailing. And, to be honest, the price-performance ratio is tough to beat when you factor in life-cycle costs and downtime avoidance.
Bolted Connections in Steel Frame Warehouse
NewsNov.17,2025
Hay Storage in Farm Metal Buildings
NewsNov.17,2025
Advantages of a Steel Portal Frame Shed
NewsNov.17,2025
The Erection Process of a Steel Building Hangar
NewsNov.17,2025
Energy Efficiency of Steel Dome Garage Kits
NewsNov.17,2025
Fire Resistance of Kit Metal Garages
NewsNov.17,2025
Products categories
Our Latest News
We have a professional design team and an excellent production and construction team.