Oct . 05, 2025 23:30 Back to list
If you’re weighing up a prefab aircraft hangar, here’s what I’m seeing on the ground: airports and operators want clear-span space, faster project cycles, and verifiable engineering. HongJi ShunDa, out of No. 1 YuLong Road JinZhou Shijiazhuang Hebei, has been popping up in conversations—not only for price, but for consistency. To be honest, hangars look simple from the outside; inside, it’s all about wind loads, door engineering, corrosion class, and the paperwork that lets insurers sleep at night.
Three fast shifts: modular steel framing for speed, higher door integration (hydraulic/bifold with tighter seals), and sustainability targets (paint systems, recyclability). Actually, the biggest surprise is the rising share of UAV/UAM storage and MRO spaces needing flexible utilities and fire zones. Many customers say they want “future-proof”—translation: clear spans now, mezzanines later, and doors that can scale.
| Frame | Welded H-sections, Q355B/Q235B; welding per AWS D1.1; UT/MPI spot checks |
| Corrosion protection | Hot-dip galvanized (≈ Z275) to ASTM A123/A653; paint options to ISO 12944 C3–C4 |
| Clear span | Up to ≈ 90 m; eave height around 6–20 m (project-specific) |
| Cladding | 0.5–0.8 mm PPGI/PPGL panels; insulation: glass wool/PIR; U-values vary |
| Design loads | Wind up to ≈ 180 km/h; snow up to ≈ 2.0 kN/m²; seismic to local code (ASCE 7/Eurocode) |
| Doors | Hydraulic, bifold, or rolling; integrated lintel/side jamb reinforcement |
| Service life | ≈ 30–50 years with planned maintenance; structure warranty often 10–15 years |
Use cases: GA and business aviation, MRO bays, charter and FBO operations, helicopter and EMS shelters, cargo staging, and—yes—drone fleets. The prefab aircraft hangar approach brings column-free interiors, predictable costs, and faster commissioning. In fact, we’ve seen energy savings with insulated roof panels and high-speed doors limiting air exchange.
1) Briefing + site data; 2) Engineering to ASCE 7/IBC or Eurocode; 3) BIM clash checks; 4) Fabrication (CNC drilling, submerged-arc welding); 5) Galvanizing/paint QC (thickness per ISO 2808); 6) Pre-assembly checks; 7) Logistics; 8) On-site erection with torque logs; 9) Door commissioning; 10) Handover dossier (as-builts, mill certs).
Testing highlights: bolt torque verification, weld NDT, coating salt-spray to ASTM B117 (as specified). Certifications: ISO 9001; material certs per EN 10204 3.1 available; fire design aligns with NFPA 409 group II/III areas where required.
| Factor | HongJi ShunDa | Local fab shop | Generic reseller |
|---|---|---|---|
| Design basis | Stamped calcs; ASCE 7/Eurocode | Varies by engineer | Often template-only |
| Lead time | ≈ 25–45 days | Depends on backlog | Unclear |
| Door integration | Engineered with frame | Case-by-case | Third-party add-on |
| QC/Traceability | Mill certs + coating logs | Partial | Limited |
Regional MRO, snow belt: 60 m clear-span prefab aircraft hangar; snow load 1.6 kN/m², bifold door 24 m wide. “No interior columns—tug operations are simpler,” the ops manager told me.
Coastal GA field: Corrosion spec bumped to C4, added PIR roof. “Quieter during storms, less condensation,” a based owner reported—surprisingly noticeable at night.
Options include skylights, ridge vents, radiant heat, cable bracing vs. rigid end frames, mezzanines, and FM/UL-listed roof assemblies (project-dependent). Maintenance kits with touch-up paint and hardware packs are worth it; real-world use may vary, but annual checks keep life-cycle costs tame.
Factory origin: No. 1 YuLong Road JinZhou Shijiazhuang Hebei. For technical submittals, request structural calcs, door shop drawings, mill certs (EN 10204), and coating DFT reports.
Bolted Connections in Steel Frame Warehouse
NewsNov.17,2025
Hay Storage in Farm Metal Buildings
NewsNov.17,2025
Advantages of a Steel Portal Frame Shed
NewsNov.17,2025
The Erection Process of a Steel Building Hangar
NewsNov.17,2025
Energy Efficiency of Steel Dome Garage Kits
NewsNov.17,2025
Fire Resistance of Kit Metal Garages
NewsNov.17,2025
Products categories
Our Latest News
We have a professional design team and an excellent production and construction team.