E‑commerce keeps speeding up, and so does industrial real estate. To be honest, the biggest shift I’ve seen lately is the surge in multistory warehouses—elevated docks, ramped circulation, automated racking—built fast with steel frames. It’s not just a trend; it’s a logistics arms race. And a well-specified Steel Structure Factory Building can be the difference between tight margins and smooth scaling.
Speed of erection, long spans, predictable costs, and, surprisingly, easier future expansion. Many customers say the payback shows up in months: fewer interior columns equals cleaner material flow. Add in higher fire performance options and smart coatings, and you get a 30–50 year service life with routine maintenance.
| Item | Spec (≈ ranges; may vary) |
|---|---|
| Primary steel | ASTM A572 Gr50 / EN S355 / Q355B; yield ≥ 345–355 MPa |
| Secondary members | Cold‑formed C/Z sections, G550 or S280–S350 |
| Bolts | High‑strength friction grip, ISO 898‑1 Grade 8.8/10.9 |
| Roof/wall | Sandwich panels (PU/PIR/mineral wool) or single skin + insulation |
| Corrosion protection | Paint DFT ≈ 120–240 μm (ISO 12944 C3–C5) or HDG ≈ 85 μm (ISO 1461) |
| Design codes | AISC 360 / Eurocode 3 / GB 50017; wind per ASCE 7 |
| Fire strategy | Intumescent coatings or encapsulation (60–120 min, project‑specific) |
Planning → Design → Pre‑construction → Fabrication → Surface treatment → Erection → QA/QC → Handover. Materials are mill‑certified (EN 10204 3.1). Welding per AWS D1.1/EN 1090‑2; NDT uses UT/MT at critical joints. Coating thickness verified per ISO 19840. Bolting torque and pre‑load tests recorded. It sounds dry, but these steps quietly decide whether your Steel Structure Factory Building runs maintenance‑free for decades.
Testing snapshot: coupon tensile tests (fy/fu), Charpy V‑Notch at −20°C where required, anchor pull‑out tests on site, and water‑tightness checks for roof laps. Real projects I’ve covered often report roof leakage defects near zero when DFT and fastener specs are enforced.
- Multistory warehouses and 3PL hubs; - Food/pharma with clean envelopes; - Automotive and EV assembly; - Cold storage extensions; - Renewable component plants. I guess the sweet spot is clear spans 30–60 m with mezzanines and heavy MEP hanging loads.
| Vendor | Certs | Lead time | Design support | Warranty | Typical price/m² |
|---|---|---|---|---|---|
| Hongjishunda | EN 1090 CE, ISO 9001/14001 | ≈ 4–8 weeks | Full BIM + value engineering | 10–15 years envelope | around $65–120 (scope‑dependent) |
| Vendor B | ISO 9001 | ≈ 6–10 weeks | 2D layouts only | 5–10 years | $55–95 |
- EV parts plant, 22,000 m²: S355 frames, 48 m spans; paint DFT avg 160 μm, leak rate 0.0% at handover; energy use dropped ≈ 12% with insulated panels. Client feedback: “No surprises, just velocity.”
- Urban 2‑level warehouse, 12,500 m²: composite deck mezzanine, live load 7.5 kPa; ramps at 1:20. Erection to enclosed shell in 38 days—faster than the neighbors expected.
Customer note: “The Steel Structure Factory Building gave us clean bay spacing for AGVs, and future conveyor lines will bolt straight on.”
- Confirm loads: seismic, wind, racks, cranes. - Specify coating system per ISO 12944 environment class. - Demand mill certs and NDT reports. - Lock logistics and site craneage early. - Plan expansion joints and future mezzanines. Also, note the origin for logistics: No. 1 YuLong Road JinZhou Shijiazhuang Hebei.
EN 1090 CE marking, ISO 9001/14001, AWS D1.1, AISC 360, Eurocode 3, ASCE 7, ISO 1461, ISO 19840, ISO 12944. These aren’t just nice to have; they keep insurers and auditors calm.
References:
Bolted Connections in Steel Frame Warehouse
NewsNov.17,2025
Hay Storage in Farm Metal Buildings
NewsNov.17,2025
Advantages of a Steel Portal Frame Shed
NewsNov.17,2025
The Erection Process of a Steel Building Hangar
NewsNov.17,2025
Energy Efficiency of Steel Dome Garage Kits
NewsNov.17,2025
Fire Resistance of Kit Metal Garages
NewsNov.17,2025
Products categories
Our Latest News
We have a professional design team and an excellent production and construction team.