If you’ve been pricing expansion space lately, you’ve probably noticed how fast steel is redefining factory timelines. I spent last month walking projects around No. 1 YuLong Road JinZhou, Shijiazhuang, Hebei, where HONGJISHUNDA’s steel structure factory building program keeps popping up in procurement shortlists. To be honest, it’s not hard to see why—speed, wide clear spans, and lifecycle math that actually pencils out.
Industry-wide, we’re seeing prefab modules, solar-ready roofs, and crane-integrated grids become the norm. Fabricators are moving to high-strength steels (Q355B/ASTM A572) and C5-rated coatings for coastal sites. Surprisingly, many customers say the biggest win is future-proofing—bolted frames and standardized bays make extensions painless.
| Parameter | Spec (≈ real-world use may vary) |
|---|---|
| Clear span | 18–48 m single span; multi-span available |
| Bay spacing | 6–9 m standard; custom on request |
| Steel grade | Q235B/Q355B (≈ ASTM A36/A572) |
| Roof/wall | Single-skin or sandwich panels (PU/Rockwool/EPS) |
| Loads | Wind up to 45–55 m/s; snow 0.5–2.0 kN/m² (site-specific) |
| Fire & corrosion | Intumescent options; ISO 12944 C3–C5 paint or ISO 1461 galvanizing |
| Service life | ≈ 30–50 years with maintenance |
Manufacturing (metalwork, assembly), distribution hubs, food or cold storage, plus office-mezzanine combos. Overhead cranes (5–50 t), dock doors, and mezzanines bolt into the main grid neatly. For phased growth, a steel structure factory building lets you add bays without drama.
| Vendor | Certs | Lead time | Span capability | Notes |
|---|---|---|---|---|
| HONGJISHUNDA | ISO 9001/14001/45001; EN 1090 | ≈ 4–8 weeks | Up to 48 m | Good crane integration; flexible bays |
| Vendor B | ISO 9001 | ≈ 6–10 weeks | Up to 36 m | Entry-level finishes |
| Vendor C | EN 1090 | ≈ 8–12 weeks | Up to 42 m | Higher-cost coatings |
Real feedback, off the record: “Frame bolt-up was quicker than the MEP,” one operations manager joked. Another buyer liked that a steel structure factory building kept options open for a freezer wing added later.
Designs follow AISC 360 or EN 1993 with detailing to EN 1090 EXC2/EXC3 as required. Coatings tested to ISO 12944 (C3–C5); galvanizing per ISO 1461. Sample lab pulls showed weld tensile meeting base-metal strength; panel U-values verified to spec sheets. Fire strategy can include intumescent paint for required ratings—always coordinate with local code (IBC/GB/Eurocode).
In short, when speed-to-value matters, a steel structure factory building is the pragmatic play: fast, scalable, and honest about lifecycle costs.
Bolted Connections in Steel Frame Warehouse
NewsNov.17,2025
Hay Storage in Farm Metal Buildings
NewsNov.17,2025
Advantages of a Steel Portal Frame Shed
NewsNov.17,2025
The Erection Process of a Steel Building Hangar
NewsNov.17,2025
Energy Efficiency of Steel Dome Garage Kits
NewsNov.17,2025
Fire Resistance of Kit Metal Garages
NewsNov.17,2025
Products categories
Our Latest News
We have a professional design team and an excellent production and construction team.